Location

Bounds Green, North London

Duration

8 weeks

Value

68k

Scope of works:

  • Reinforced ground beams
  • Reinforced concrete slab and associated drainage
  • Services and ducts, plus paving and finishing

Project Details:

A difficult project for any ground-worker. The site is a scouts camp for a number of scouts and also local community clubs. The project was at the back of the site meaning all traffic had to pass through the site with the potential of causing harm to vulnerable children and adults. Poppet takes great pride in delivering projects in the safest possible way. All vehicles were banked in and out of the site, with safe enclosures erected at certain points for added protection.